A refractory Certificate of Analysis (COA) is useful only when it can be tied to the material being supplied and to the acceptance rules in the purchase order. A polished document is not evidence by itself. The reviewer needs to connect the product grade, batch or lot, sample, test method, specimen condition, units, result and contractual limit.

This guide does not publish universal tolerances. Refractory acceptance limits vary by material family, grade, application, project specification and test procedure. The practical question is therefore not “does this number look normal?” but “was the agreed property tested on the right sample, by the agreed method, under the agreed conditions, and does the result meet the stated criterion?”

Step 1: Confirm the Document and Batch Identity

The seven fields that make a result reviewable

PRODUCT / GRADE:  exact ordered designation
LOT / BATCH:      identifier matching bags, pallets or labels
SAMPLE:           source, location, quantity and sampling date
PROPERTY:         chemical or physical characteristic required
METHOD:           standard number, edition and any agreed deviation
CONDITION:        specimen preparation, curing/drying/firing and units
RESULT / LIMIT:   measured value beside the contractual acceptance rule

A COA may contain additional fields such as production date, test date, laboratory, report number and approval signature. Those fields support document control, but they do not cure a missing batch link or an undefined test condition.

Step 2: Match Each Property to the Purchase Requirement

Chemical composition can help confirm material identity and grade, but no single oxide percentage proves service performance. The relevant oxides and reporting limits must come from the ordered grade, applicable material standard and project specification.

What to verify before judging a result
Property groupDocument checkCommon comparison error
Chemical compositionMethod, basis of reporting, units and required oxidesComparing a typical datasheet value with a contractual limit
Bulk density / porosityMaterial form, test method and specimen conditionComparing burned brick data with a castable test piece
CCS / MORSpecimen geometry, preparation, conditioning temperature and unitsComparing results taken after different heat treatments
Permanent linear changeReference length, firing temperature, hold time and sign conventionReading expansion and shrinkage without the test schedule

Do not invent a tolerance during document review. If the purchase specification gives no limit for a reported property, record it as information only and ask the purchaser or designer whether an acceptance criterion is required.

Step 3: Check the Test Method and Specimen Condition

ASTM and ISO documents answer different questions. A classification standard is not automatically the test method for every property, and a method written for burned brick should not be assigned to an unshaped castable without a valid basis.

Common standards encountered in refractory documentation
ReferenceWhat its published scope coversHow to use it in review
ASTM C401-12(2022)Classification of alumina and alumina-silicate castable refractoriesConfirm that a claimed castable class follows the referenced classification; do not treat it as the method for every reported property
ASTM C133-97(2021), historicalCold crushing strength and modulus of rupture of refractoriesIf a contract cites it, confirm that the named edition remains the agreed basis; check specimen and loading conditions before comparing results
ASTM C20-00(2022)Apparent porosity, water absorption, apparent specific gravity and bulk density of burned refractory brick and shapes by boiling waterConfirm that the material form and method match; do not apply a burned-shape result to monolithic material by assumption
ISO 1927-5Preparation and treatment of test pieces for unshaped refractory productsUse with the agreed test programme to check mixing, shaping, curing, drying and firing records
ISO 1927-6:2012Measurement of physical properties of unshaped refractory productsConfirm the reported property and the test-piece preparation reference are paired correctly

Always verify the edition required by the tender or purchase order. A later edition is not automatically interchangeable when the contract names a specific edition.

Minimum condition data for physical properties

  • Material form: burned brick, prefabricated shape, dry mix, cast or gunned monolithic.
  • Sampling source and relationship to the supplied lot.
  • Specimen dimensions and preparation method.
  • Water addition or mixing condition where relevant.
  • Curing, drying and firing temperature, duration and sequence.
  • Number of specimens and whether the result is individual, average, minimum or maximum.
  • Units and rounding convention.

Quality Red Flags in COA Documents

🚩 No lot or batch identifier — The report cannot be linked to the markings on the supplied material.
🚩 "Pass" without the required measured value — The purchaser cannot independently compare the result with the agreed limit.
🚩 Required property omitted — A datasheet or unrelated test cannot substitute for a result explicitly required by the PO or inspection plan.
🚩 Method or edition missing — The result cannot be reproduced or compared on a controlled basis.
🚩 Specimen condition missing — Strength, density and linear-change values are ambiguous without preparation and heat-treatment details.
🚩 Units or decimal format inconsistent — Pause the comparison until the laboratory confirms the intended unit and value.
🚩 Sample identity does not match the shipment — A valid test result for another lot does not release the affected lot.
🚩 Acceptance decision has no named basis — The PO, approved datasheet or project specification should be cited beside the decision.

Step 4: Hold, Clarify, and Retest Without Losing Traceability

1. Quarantine the affected lot

When a required result is missing, outside the agreed limit or not traceable to the shipment, identify and hold the affected material according to the receiving-inspection procedure. Do not mix it with released stock while the document issue is unresolved.

2. Issue a specific clarification request

State the document number, lot, property, reported value, required limit and missing method or condition. Avoid vague requests such as “send a better COA.” A reviewable response should resolve the exact gap.

3. Preserve the document chain

Keep the original file, revision, sender, receipt date and any superseding report. A replacement COA should identify what changed and remain tied to the same lot or to a clearly documented resample.

4. Use agreed sampling and retest rules

Independent testing may be appropriate for critical service, disputed results or contractually defined surveillance. The inspection and test plan should specify who samples, where the sample is taken, sealing and chain of custody, laboratory qualification, method and edition, acceptance rule, retest procedure and allocation of cost.

5. Record the disposition

The final status should be explicit: released, conditionally accepted by authorized personnel, reworked, replaced or rejected. A technical explanation does not itself authorize use of nonconforming material.

Document-control evidence to retain

Depending on the project and contract, the file may include:

  • Purchase order, approved datasheet and applicable specification revision.
  • Supplier COA or batch test report and any revisions.
  • Material labels, packing list and receiving photographs.
  • Sampling record, seal numbers and chain-of-custody record where used.
  • Independent laboratory report and purchaser disposition.

Need COA Interpretation Support?

Send the purchase specification together with the sample COA. We can first identify missing fields and comparison gaps; material acceptance and third-party testing remain project-specific.

Request COA Review

Step 5: Put the Document Rules in the RFQ and PO

A supplier cannot reliably prepare the required document pack if the tender only says “COA required.” Define the minimum fields, submission timing and disposition process before award.

COA / BATCH TEST REPORT CHECKLIST

[ ] Exact product and grade designation
[ ] Purchase order item and quantity covered
[ ] Lot / batch number matching material markings
[ ] Sampling basis and sample identification
[ ] Required properties and actual measured results
[ ] Contractual acceptance limit beside each result
[ ] Test method, edition, units and specimen condition
[ ] Curing / drying / firing schedule where relevant
[ ] Test date, report number and laboratory identity
[ ] Authorized approval or controlled electronic issue
[ ] Rule for missing data, nonconformance and retest
[ ] Required submission point: bid, approval, pre-shipment or delivery

Do not copy this checklist as a technical specification without engineering review. The purchaser must add the correct property list, limits, methods, sampling frequency and test-piece conditions for the actual refractory grade and service.

Official Standards References

  • ASTM C401-12(2022) — classification of alumina and alumina-silicate castable refractories.
  • ASTM C133-97(2021) — ASTM currently lists this cold crushing strength and modulus of rupture reference as historical; confirm the contractual basis before use.
  • ASTM C20-00(2022) — apparent porosity, water absorption, apparent specific gravity and bulk density of burned refractory brick and shapes by boiling water.
  • ISO 1927-5:2012 — preparation and treatment of test pieces for unshaped refractory products.
  • ISO 1927-6:2012 — measurement of physical properties of unshaped refractory products.

These links identify the published scope of each reference. The full standard, contract and project specification control the detailed procedure and acceptance decision.

The decision rule

Release a refractory lot only when the material identity, required document, sample, method, specimen condition, units, result and acceptance criterion form one traceable chain. If one link is missing, record the gap and resolve it before treating the COA as proof of compliance.

Technical scope: document review and procurement workflow. This guide does not establish product-specific acceptance limits, certify any batch, or replace the applicable standard, project specification, inspection plan or laboratory report.

Frequently Asked Questions

Refractory COA FAQ

A datasheet normally presents a grade's declared or typical properties. A COA should identify the supplied batch and report the results required for that batch. An independent test report records results for the sample received by a separate laboratory. None replaces the purchase specification, which defines the acceptance criteria and required documents.

No. Acceptance limits depend on the product grade, applicable standard, project specification, test method, specimen preparation, conditioning temperature and contract. Compare each result with the agreed requirement in the same units and under the same stated test conditions.

Usually not. A result is meaningful only with its method, specimen geometry, preparation procedure, curing or drying schedule, firing temperature and hold time, units, and sampling basis. If those conditions differ, treat the comparison as unresolved until the laboratory or purchaser confirms equivalence.

Hold the affected lot when the batch or sample identity does not match, required results or test conditions are missing, a result falls outside the agreed acceptance criteria, units cannot be reconciled, or the parties dispute sample representativeness. The contract or inspection plan should define sampling, method and retest handling.

Quality Assurance Support

Prepare a Reviewable COA Package

Send the purchase specification, product grade and sample COA. We will first confirm the document checklist and identify missing comparison data before deciding what technical review is possible.